§ 25-373. Special use permits.  


Latest version.
  • The following uses shall be permitted only by special use permit approved by the board of supervisors:

    Abattoirs (rendering plants).

    Acetylene manufacturing.

    Acid manufacturing.

    Automobile, vehicle graveyards.

    Canning.

    Carnivals, circuses, fairs and other events lasting more than ninety-six (96) hours but less than four (4) months.

    Crushed stone operations.

    Curing food.

    Demolisher.

    Electric transmission (private).

    Electric towers (private).

    Fertilizer mill.

    Feed and grain storage.

    Flour milling.

    Food products manufacturing.

    Frozen food products manufacturing.

    Fruit processing.

    Gasoline stations.

    Gasoline storage (bulk).

    Grain milling.

    Greenboxes.

    Heliports, airports, landing strip (intensive use), landing strip (recreational use)—(See section 25-112).

    Incineration of animals, garbage, wastes (nonradioactive).

    Junkyards, salvage yards.

    Landfills, nonhazardous, nonradioactive materials and approved by the State Health Department.

    LP gas, natural gas storage.

    Malt products manufacturing.

    Matches manufacturing.

    Milk bottling.

    Milk, dairy products manufacturing.

    Mining (conforming to state regulations).

    Off-site mass drainfields (See section 25-144).

    Off-site wells, water tanks, and/or water systems (see section 25-145).

    Oil, gas transmission facility.

    Ordinance (explosives) manufacturing.

    Petroleum, petroleum by products refining, processing, storage.

    Poultry processing, packaging.

    Quarrying (conforming to state regulations).

    Roasted coffee, tea products.

    Radio and TV towers.

    Radio and TV transmission/transmitters.

    Salvage yards.

    Self-service storage facility.

    Spice processing, packaging.

    Sugar processing, packaging.

    Wind energy facilities; small system (See section 25-128(c)).

    Wind energy facilities; large system (See section 25-128(c)).

    Wind energy facilities; utility scale system (See section 25-128(c)).

    (Ord. of 5-25-88; Res. No. 24-11-92, 11-17-92; Res. No. 21-12-95, 12-19-95; Res. No. 26-09-99, 9-21-99; Res. No. 13-02-2002, 2-19-02; Ord. of 2-15-05(4); Res. No. 26-05-2008, 5-20-08; Res. No. 5-05-2009, 5-19-09)

(Ord. of 5-25-88; Res. No. 24-11-92, 11-17-92; Res. No. 21-12-95, 12-19-95; Res. No. 26-09-99, 9-21-99; Res. No. 13-02-2002, 2-19-02; Ord. of 2-15-05(4); Res. No. 26-05-2008, 5-20-08; Res. No. 5-05-2009, 5-19-09)